Article 8115

Title of the article

                        ON THE PROBLEM OF OPTIMIZATION OF THE QUALITY MANAGEMENT PROCESS                            IN COMPLEX PROJECTS REALIZATION

Authors

Bezrodnyy Boris Fedorovich, doctor of technical sciences, professor, chief engineer, Design-technological bureau of railway automation and remote control (105082, 21/9 Perevedenovskiy lane, Moscow, Russia), boris.bezrodny@yandex.ru
Mikheev Evgeniy Aleksandrovich, candidate of technical sciences, senior stuff scientist,  Inter-regional public institution «Institute of engineering physics» (142210, 1 «A» B. Udarniy lane, Serpukhov city, Moscow region, Russia), info@iifrf.ru

Index UDK

62-503.5

Abstract

Provides a process for implementation of comprehensive projects aimed at ensuring power supply industrial as a collection of parts, which allows after the acceptance tests pass the equipment into service to the customer. An analysis of the technological cycle for example enterprise LLC «Abiteh».

Key words

power supply, maintenance, equipment, commissioning, destabilizing factors.

Download PDF

 

Дата создания: 30.07.2015 14:52
Дата обновления: 05.08.2015 15:08